Honeywell International, which purchased the site in 1998 after LCP Chemical filed for bankruptcy, reports that 225,000 tons of contaminated soil and material and 13 acres of contaminated marshland have been removed from the area. However, unsafe levels of polychlorinated biphenyls (PCBs), mercury, lead and polynuclear aromatic hydrocarbons (PAHs) remain present.

The EPA’s 1994 target action for total PCB levels on the site was 25 parts per million (ppm). A 2014 public health assessment of the site by federal public health organization the Agency for Toxic Substances and Disease Registry (ATSDR) found that six half-acre grids exceeded this concentration and 36 half-acre grids had PCB concentrations of 1 to 24 ppm.

The EPA presented its proposed plan (PDF) at a public meeting in Brunswick on Dec. 4. The plan calls for three remedies: removing sediment from 7 acres, capping 6 acres “with layers of sand, silt, gravel and rock,” and covering 11 acres with a layer of sand. In all, roughly 24 acres will be remedied.

Daniel Parshley, executive director of environmental watchdog Glynn Environmental Coalition, said, “There is a long history of ignoring how big the site is and lowballing the acres.” The coalition recommends removal of 81 of the most contaminated acres.

The EPA holds that the contamination levels do not justify dredging and removing additional acreage because of concerns about disturbing the marshland. However, Parshley and Peter DeFur of consulting firm Environmental Stewardship Concepts were quick to point out that marshland restoration has become a common practice.

Read more
Lift Parts Express
We offer you the best deals on all parts for your fleet of trucks. For a quote on a part or attachment we offer, please get in touch with us at:


TOLL FREE: 1-888-695-7994
Auburn, Alabama

forkliftpartsauburn.com

Email Us
About Us